Quantcast

NE Wyoming News

Sunday, September 22, 2024

I-30 Westbound and Eastbound Mainlanes to be Closed Overnight Nov. 11-14 Between Six Flags Drive and Ballpark Way for Bridge Construction

The Texas Department of Transportation's work continues on the $233 million Interstate 30/SH 360 Interchange Project in Arlington.

Closures listed below are subject to changes due to weather and schedule. For more information and new project photos, please visit the Keep 30360 Moving website.

New or updated items are indicated in bold.

The City of Arlington has partnered with Waze to give drivers the best experience possible to get around town. Drivers can download Waze for free at www.waze.com/get for iOS and Android and see real-time traffic, find optimal routes, avoid road closures and more.

Click here to learn more about the I-30/SH 360 Interchange Project.

I-30 Mainlanes and Ramps 

I-30 Westbound Mainlanes

  • Daily, Nov. 9-10, 9 a.m. - 3 p.m.: The right, outside lane of I-30 westbound mainlanes will be closed between Six Flags Drive and Ballpark Way to move equipment.
  • Continuously, Nov. 11, 8 p.m. to Nov. 14, 5 a.m.: I-30 westbound mainlanes will be closed between Six Flags Drive and Ballpark Way for bridge construction. Traffic will be detoured to exit Six Flags Drive and continue on the I-30 westbound frontage road to re-enter from the AT&T Way/Baird Farm Road entrance ramp. EXPECT DELAYS.
  •  Continuously, Nov. 18, 8 p.m. to Nov. 21, 5 a.m.: I-30 westbound mainlanes will be closed between Six Flags Drive and Ballpark Way for bridge construction. Traffic will be detoured to exit Six Flags Drive and continue on the I-30 westbound frontage road to re-enter from the AT&T Way/Baird Farm Road entrance ramp. EXPECT DELAYS.
I-30 Eastbound Mainlanes

  • Continuously, Nov. 11, 8 p.m. to Nov. 14, 5 a.m.: I-30 eastbound mainlanes will be closed between SH 360 and Six Flags Drive for bridge construction. Traffic will be detoured to exit Six Flags Drive and continue on the I-30 eastbound frontage road to re-enter from the Six Flags Drive entrance ramp. EXPECT DELAYS.
  • Continuously, Nov. 18, 8 p.m. to Nov. 21, 5a: I-30 eastbound mainlanes will be closed between SH 360 and Six Flags Drive for bridge construction. Traffic will be detoured to exit Six Flags Drive and continue on the I-30 eastbound frontage road to re-enter from the Six Flags Drive entrance ramp. EXPECT DELAYS.
I-30 Eastbound Exit to SH 360 Southbound

  • Effective Aug. 9, 2020: This direct connector ramp from I-30 eastbound mainlanes to SH 360 southbound mainlanes is now in service.
I-30 Eastbound Exit to SH 360/Six Flags Drive

  • PERMANENT: Effective June 19, 2021: The I-30 eastbound exit to SH 360/Six Flags Drive is detoured to exit for the current eastbound exit to Six Flags Drive. 
I-30 Westbound Entrance from SH 360/Six Flags Drive

  • Effective Sept. 2, 2022: The I-30 westbound entrance ramp from SH 360/Six Flags Drive was returned to service.
  • Effective Aug. 26, 2020: A new traffic signal is active at the intersection with the new, permanent I-30 westbound exit ramp to SH 360/Six Flags Dr. Traffic passes through this signalized intersection to access the westbound I-30 entrance ramp. BE AWARE OF NEW TRAFFIC PATTERN.
I-30 Eastbound Entrance from Convention Center Drive/Copeland Road Intersection 

  • PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Drive/Copeland Road intersection will be closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
I-30 Eastbound Entrance from Northbound Ballpark Way

  • PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way will be closed permanently for the construction of a new northbound Ballpark Way connector to eastbound Copeland Road
I-30 Westbound Exit to SH 360 Northbound

  • Weeknights, Nov. 1-14, 8 p.m. - 5 a.m.: The I-30 west to SH 360 north direct connector ramp will be closed for bridge construction. Traffic will be directed to exit the preceding exit to SH 360/Six Flags Drive and follow detour signs.
  • Continuously, Nov. 11, 8 p.m. to Nov. 14, 5 a.m.: The I-30 west to SH 360 north direct connector ramp will be closed for bridge construction. Traffic will be directed to exit the preceding exit to SH 360/Six Flags Drive and follow detour signs.
  • Continuously, Nov. 18, 8 p.m. to Nov. 21, 5 a.m.: The I-30 west to SH 360 north direct connector ramp will be closed for bridge construction. Traffic will be directed to exit the preceding exit to SH 360/Six Flags Drive and follow detour signs.
  • Continuously, Dec. 9, 8 p.m. to Dec. 12, 5 a.m.: The I-30 west to SH 360 north direct connector ramp will be closed for bridge construction. Traffic will be directed to exit the preceding exit to SH 360/Six Flags Drive and follow detour signs.
  • This direct connector ramp from I-30 westbound mainlanes to SH 360 northbound mainlanes has been placed into service.
I-30 Westbound Exit to SH 360/Six Flags Drive

  • Effective Aug. 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
I-30 Eastbound Entrance from Copeland Road

  • Continuously, Dec. 16, 8 p.m. to Dec. 19, 5 a.m.: The I-30 eastbound entrance ramp from Copeland Road will be closed for bridge construction. Traffic will be detoured on the I-30 eastbound frontage road across Six Flags Drive to the next entrance ramp. EXPECT DELAYS.
I-30 Eastbound Entrance from Convention Center Dr/Copeland Rd Intersection

  • PERMANENT: The eastbound I-30 entrance ramp available from the Convention Center Dr/Copeland Rd intersection is closed permanently. Traffic will continue to have access to the ramp to northbound Ballpark Way.
I-30 Eastbound Entrance from Northbound Ballpark Way

  • PERMANENT: The eastbound I-30 entrance ramp from northbound Ballpark Way is closed permanently. This ramp now serves as an uninterrupted ramp to eastbound Copeland Road.
I-30 Westbound Exit to SH 360/Six Flags Drive

  • Effective Aug. 26, 2020: A new I-30 westbound exit ramp to SH 360/Six Flags Dr is open to traffic, replacing the previous loop exit ramp. Traffic makes a left turn through a signalized intersection to continue across I-30 towards SH 360. BE AWARE OF NEW TRAFFIC PATTERN.
I-30 Westbound Frontage Road

  • Nightly, Nov. 10-17, 8 p.m. - 5 a.m.: The I-30 westbound frontage road between Six Flags Drive and SH 360 will be closed for bridge construction. Traffic will be detoured north to Lamar Boulevard, then west to Baird Farm Rd, and south to return to the I-30 westbound frontage road.
    o Continuously, Dec. 9, 8 p.m. to Dec 12, 5 a.m.: The I-30 westbound frontage road between Six Flags Dr and SH 360 will be closed for bridge construction. Traffic will be detoured north to Lamar Boulevard, then west to Baird Farm Road, and south to return to the I-30 westbound frontage road.
  • Effective Feb. 11, 2022: The I-30 westbound frontage road between Six Flags Drive and Ballpark Way was opened.
I-30 Eastbound Frontage Road

  • Continuously, Nov 1-14, 8 p.m. tp 5 a.m.: The I-30 eastbound frontage road between Copeland Road and Six Flags Drive will be closed for bridge construction. Traffic will be detoured to eastbound Six Flags Drive.
  • Oct 15, 2022: The I-30 eastbound frontage road between Copeland Rd and Six Flags Dr was placed into service.
I-30 HOV Lanes (between Great Southwest Parkway and Cooper Street)

Westbound I-30 HOV lane west of SH 161

  • The westbound HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.
Eastbound I-30 HOV lane between Center Street and Duncan Perry Road

  • The eastbound HOV lane access near Center Street and lane through Tarrant County will be closed. TEXpress lane traffic will enter at SH 161.
SH 360 Mainlanes and Ramps

SH 360 Southbound Mainlanes

  • Weeknights, Oct 17-Nov 14, 8p-5a: The SH 360 southbound mainlanes will be closed between Ave J and Six Flags Drive for bridge construction. Traffic will be detoured to exit Ave J/Lamar Boulevard/Six Flags Drive, continue on the SH 360 southbound frontage road to re-enter from the ramp from Lamar Blvd.  EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
SH 360 Northbound Mainlanes

  • Nov. 8, 9 a.m. - 3 p.m.: The right, outside lane of SH 360 northbound mainlanes between Ave J and Burney Rd for pavement work.
  • Weeknights, Oct. 17-Nov. 14, 8 p.m. - 5 a.m.: The SH 360 northbound mainlanes will be closed between Ave J and Six Flags Drive for bridge construction. Traffic will be detoured to exit Six Flags Drive, continue on the SH 360 northbound frontage road to re-enter from the ramp from Brown Boulevard/Ave K. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTE.
SH 360 Southbound Entrance from Brown Boulevard/Avenue K

  • PERMANENT: The SH 360 southbound entrance from Brown Boulevard/Avenue K is PERMANENTLY CLOSED. Traffic is detoured along the SH 360 southbound frontage road to enter from the Six Flags Drive entrance ramp. A new entrance ramp will be constructed between Lamar Boulevard and Six Flags Drive.
SH 360 Northbound Exit to Lamar Boulevard

  • The SH 360 northbound exit to Lamar Boulevard is closed for reconstruction. Traffic is directed to exit Six Flags Drive and continue on the northbound frontage road to Lamar Boulevard.
SH 360 Northbound Entrance from Lamar Boulevard

  • PERMANENT: The SH 360 northbound entrance from Lamar Boulevard is PERMANENTLY CLOSED. Traffic will be detoured along the SH 360 northbound frontage road to enter from the Brown Blvd/Ave K entrance ramp. A new permanent entrance ramp will be constructed between Ave J and Brown Blvd/Ave K.
SH 360 Southbound Exit to Ave J/Lamar Boulevard/Six Flags Drive/Randol Mill Road

  • A new SH 360 southbound exit ramp to Avenue J/Lamar Boulevard is open to traffic.
SH 360 Southbound Exit to I-30 Westbound

  • Weeknights, Oct. 17- Nov. 14, 8 p.m. - 5 a.m.: The SH 360 southbound exit to I-30 westbound will be closed in coordination with the mainline closure for bridge construction. Traffic will be detoured to exit Ave J/Lamar Boulevard/Six Flags Drive, continue on the SH 360 southbound frontage road, turn west on Lamar Boulevard, and turn south on Baird Farm Road to return to the I-30 westbound frontage road.
  • Effective Aug 1, 2020: This direct connector ramp is open to traffic.
SH 360 Southbound Exit to Lamar Boulevard

  • PERMANENT: The SH 360 southbound exit to Lamar Boulevard is PERMANENTLY CLOSED. Traffic is detoured to exit to Brown Boulevard/Avenue K and follow the SH 360 southbound frontage road to Lamar Boulevard. A new exit ramp will be constructed to Avenue J/Lamar Boulevard/Six Flags Drive.
SH 360 Southbound Entrance from Lamar Boulevard 

  • Weeknights, Nov. 1-14, 8 p.m. - 5 a.m.: The SH 360 southbound entrance ramp from Lamar Boulevard will be closed in coordination with the SH 360 southbound mainlanes closure for bridge construction. Traffic will be directed to the next entrance ramp from Six Flags Drive.
  • The new, permanent SH 360 southbound entrance from Lamar Boulevard is open for service.
SH 360 Northbound Exit to Brown Boulevard/Ave K

  • PERMANENT The SH 360 northbound exit to Brown Boulevard/Ave K is PERMANENTLY CLOSED to construct a new entrance ramp between Ave J and Brown Boulevard/Ave K. Traffic will be directed to exit Six Flags Drive and continue on the SH 360 northbound frontage road to Brown Boulevard/Ave K.
SH 360 Northbound Exit to I-30/Six Flags Drive/Lamar Boulevard/Avenue J

  • The SH 360 northbound exit to Six Flags Drive/Lamar Boulevard/Avenue J was moved to a new, temporary exit ramp. BE AWARE OF NEW TRAFFIC PATTERN. 
  • Anticipated Fall 2022: The SH 360 northbound exit to I-30/Six Flags Dr/Lamar Blvd/Ave J will be closed after the SH 360 northbound exit to Lamar Blvd/Ave J/Brown Blvd is opened for service. This will be a permanent closure. Six Flags Dr traffic will then be directed to exit for SH 180/Division St/Randol Mill Rd/Six Flags Dr.
SH 360 Frontage Road

SH 360 Southbound Frontage Road

SH 360 South-to-North U-turn at Lamar Boulevard

  • The SH 360 south-to-north U-turn at Lamar Boulevard will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
SH 360 South-to-North U-turn at Six Flags Drive

  • The SH 360 south-to-north U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction.
SH 360 Northbound Frontage Road 

Six Flags Drive to Lamar Boulevard

  • Continuously, Nov. 11, 8 p.m. to Nov. 14, 5 a.m.: The SH 360 northbound frontage road between Six Flags Drive and Lamar Boulevard will be closed for bridge construction. Traffic will be detoured eastbound on Six Flags Drive, cross over I-30, and return on westbound Lamar Boulevard to the SH 360 northbound frontage road. EXPECT DELAYS.
Six Flags Drive to Brown Boulevard/Ave K

  • Through Fall 2022: The SH 360 northbound frontage road between Six Flags Drive and Brown Boulevard is reduced to one lane for construction of the new northbound frontage road.
Randol Mill Road to Six Flags Drive

  • Anticipated Fall 2022: Traffic will be shifted to a new, permanent road alignment approaching Six Flags Dr.
SH 360 North-to-South U-turn at Lamar Boulevard

  • Continuous, Sept. 23 - Oct. 22: The SH 360 north-to-south U-turn at Lamar Blvd will be closed while direct connector bridges are under construction.
SH 360 North-to-South U-turn at Six Flags Drive

  • The SH 360 north-to-south U-turn at Six Flags Drive will be closed while the SH 360 mainlanes and northbound frontage road are under construction. 
Local Streets

Lamar Boulevard

  • Weeknights, Nov. 7-14, 8 p.m. - 5 a.m.: Eastbound and westbound Lamar Blvd under SH 360 will be closed for bridge construction. Eastbound traffic will be detoured south on the SH 360 southbound frontage road, crossing under SH 360 at Six Flags Drive, and return on the SH 360 northbound frontage road. Westbound traffic will be detoured north on the SH 360 northbound frontage road, cross over SH 360 at Ave J, and return on the SH 360 southbound frontage road. EXPECT DELAYS.
  • Feb 2022 through Fall 2022: Eastbound and westbound Lamar Boulevard will be reduced to one lane in each direction under SH 360 to construct permanent westbound pavement. WATCH FOR NEW TRAFFIC PATTERN.
Glenn Drive

  • Daily, Nov. 7-9, 9 a.m. - 3 p.m.: The intersection of SH 360 northbound frontage road and Glenn Drive will be closed for storm drain work. Traffic will be detoured to use Ave E and 106th St to reach and leave from Glenn Drive.
Six Flags Drive

  • Weeknights, Nov 1-14, 8p-5a: Six Flags Drive under SH 360 will be closed for bridge construction. Traffic will be detoured on the frontage roads to the next crossing. EXPECT DELAYS.
Copeland Road

  • PERMANENT: Copeland Road between Six Flags Drive and the SH 360 southbound frontage is closed.
  • PERMANENT: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way is permanently closed. Only eastbound Copeland Road traffic will be allowed between Ballpark Way and Six Flags Drive.
Convention Center Drive/Copeland Road Intersection 

  • PERMANENT: The I-30 eastbound entrance ramp available from this intersection was removed permanently from service. Access to northbound Ballpark Way is maintained.
105th Street

  • PERMANENT: 105th Street between Six Flags Drive and Avenue E is permanently closed and will be removed.
Original source can be found here

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS